Basement Finishing Permit Costs in the Denver Metro (2026)
What a basement finish permit costs, city by city, with links to every fee schedule. Estimates, not quotes.
People ask us all the time: “What’s the permit going to cost?” The honest answer is that it depends on which side of a city line your house is on. Two identical basements, one in Englewood and one in Castle Rock, can have permit bills that are more than $1,000 apart.
So we pulled the official fee schedules for 14 cities and counties around Denver and ran the same basement through each one. Here’s what we found, with links to every source so you can check our math.
Quick answer: for a typical 1,000 sq ft basement with one bedroom and one bathroom, permit fees plus the use tax collected at the permit counter usually run about $750 to $3,150 in the Denver metro. Most of that spread comes from use tax and plan review, not the permit fee itself.
These are estimates built from published schedules as of October 2026. Cities update fees, usually January 1 or July 1. Your real number is set by the building department when it reviews your plans.
How basement permit fees work (the 60-second version)
Almost every city in the metro uses some version of the same formula:
- Valuation. The city puts a dollar value on your project. Some use your contract price. Some use the higher of your contract price or the ICC “Building Valuation Data” table. A few (Castle Rock, Erie) use a fixed dollar-per-square-foot number for basement finishes.
- Permit fee. That valuation gets run through a tiered table. Most metro cities use a version of the old 1997 Uniform Building Code Table 1-A: a base fee for the first $50,000, then $6–$8 for each additional $1,000.
- Plan review fee. Usually 65% of the permit fee. Denver charges 50%. Jefferson County caps it at $100 on small residential remodels. Erie doesn’t charge it on basement finishes.
- Use tax on materials. This is the one that surprises people. Most cities collect their sales/use tax on building materials up front, usually by assuming materials are 50% of the job. On a $60,000 basement, that’s often $900–$1,300 on its own. It’s reconciled at the end of the job.
- Trade permits. Some cities fold electrical, plumbing, and mechanical into one building permit. Others (Westminster, for one) charge for each trade.
The example we used everywhere
- 1,000 sq ft unfinished basement, finished into 1 bedroom, 1 full bathroom, living area
- Assumed valuation: $60,000 (labor plus materials), which is the low end of what this job costs in our market. See what it costs to finish a basement.
- Where a city sets its own per-square-foot valuation, we used that instead and say so.
- “Fraction thereof” means a partial $1,000 counts as a full $1,000. At exactly $60,000, that’s 10 units over $50,000.
- Not included: egress window permits billed separately, re-inspection fees, electrical-only state fees, fire district review, septic approval, HOA review, or credit-card surcharges.
Every worked example below is an estimate, not a quote.

Summary comparison table
| City / area | Fee basis (schedule year) | Plan review | Use tax collected at permit | Est. total, 1,000 sq ft / $60k |
|---|---|---|---|---|
| Denver | Valuation table, higher of contract or ICC (ADMIN 138, rev. May 2024) | 50% | None at permit; 5.15% Denver use tax paid on materials at purchase | $735 at permit (materials tax paid separately) |
| Aurora | Flat $536 basement finish (2026) | Included | 3.75% of materials (4.00% Arapahoe Co.) | ~$1,661 (~$1,736 Arapahoe) |
| Lakewood | Valuation table (Jan 2021 schedule, still the one the city links) | 65% | 3% of 50% of valuation | ~$2,045 |
| Arvada | Valuation table, higher of contract or Table 18-2 (2026) | 65% (or $40, see notes) | 3.46% × 58% of valuation | ~$2,399 (~$1,968 if $40 review applies) |
| Westminster | Valuation table + 15% per trade (Jan 2026) | 65% + 15% per trade | 4.25% of 50% of valuation | ~$2,725 |
| Centennial | Valuation table (current posted) | 65% | 2.5% city + 0.25% Arapahoe Co., on 50% of valuation | ~$2,003 |
| Littleton | Valuation table (Res. 2025-105) | 65% | 1.969% of valuation + 0.125% open space | ~$2,552 |
| Englewood | Valuation table (Jan 2026) | 65% | 3.8% + 0.25% county, on 50% of valuation | ~$2,557 |
| Wheat Ridge | Valuation table (2026 budget) | 65% | 3.5% of 60% of valuation | ~$2,597 |
| Castle Rock | $20.51/sq ft valuation (2026, July update) | 65% | 4.2% town + 1% Douglas Co., on 50% of valuation | ~$1,086 |
| Ken Caryl / Jefferson County | Valuation table (eff. July 1, 2026) | 65%, capped at $100 under $75k | None (county has no use tax) | ~$867 incl. $100 zoning review |
| Commerce City | Valuation table (Section 2 fee schedule) | 65% | 4.5% of 60% of valuation | ~$3,144 |
| Erie | $38.72/sq ft valuation (2026) | None on basement finish | (3.5% town + 1.335% Boulder Co.) on 50% of valuation | ~$1,469 |
| Brighton | Valuation table (Res. 2025-87, 2026) | 65% | 3.75% of 50% of valuation | ~$2,303 |
| Golden | Valuation table (05/01/2011 schedule) | 65% | 3% of 50% of valuation | ~$2,195 |

City-by-city breakdown
Denver
- How fees are calculated: Valuation table in ADMIN 138 Denver Building Code Fee Policy (revised May 21, 2024; still the posted schedule on the Development Fees page in 2026). Valuation is the higher of your contract value or ICC building valuation data.
- Plan review: 50% of the permit fee (quick permits: none).
- Use tax on materials: Denver does not collect use tax when it issues the permit. Its 5.15% consumer’s use tax on construction materials is paid to suppliers at purchase or on the contractor’s use tax return (Denver Treasury contractor guide, 2026). That’s why Denver’s number looks low next to the suburbs.
- Worked example (estimate): $50,001–$100,000 tier = $420 + $7 per $1,000 over $50,000. $420 + (10 × $7) = $490 permit + $245 plan review = $735, before use tax. If ICC data values your basement above $60,000, the fee goes up.
Aurora
- How fees are calculated: Flat fee. The 2026 Flat Rate Fee Permits sheet lists Basement Finish at $536. An egress window installation on its own is a $99 flat permit.
- Use tax: 3.75% of building materials cost (4.00% in the Arapahoe County part of Aurora), per Aurora Use Tax. The deposit can’t be less than 3.75% of 50% of the city’s fee-determination assessment. It’s reconciled within 90 days of final.
- Worked example (estimate): $536 + (3.75% × $30,000 assumed materials) = $536 + $1,125 = ~$1,661. Arapahoe County side: $536 + $1,200 = ~$1,736.
Lakewood
- How fees are calculated: Valuation table. The most recent full schedule we could open is the January 2021 fee handout (a contractor’s copy of the city handout). As of October 2026, the city’s Building and Construction Permits page still links that January 2021 schedule.
- Plan review: 65% of permit fee.
- Use tax: 3% of estimated materials, where materials = 50% of contract cost (Lakewood use tax handout).
- Trade permits: Building, plumbing, mechanical and electrical permits are each referenced on the basement finish handout; MEP contractors must be registered with Lakewood.
- Worked example (estimate, using the posted 2021 rates): $625.15 + (10 × $6.90) = $694.15 permit + $451.20 plan review + $900 use tax = ~$2,045.
Arvada
- How fees are calculated: Valuation is the higher of your contract value or Arvada’s Table 18-2, run through Table 18-1 (2026 Building Permit Guide and Schedule; Building Fee Schedule). Table 18-1, $50,001–$100,000: $654.25 + $7.00 per $1,000. Table 18-2 values a basement finish at $31.50/sq ft, so for 1,000 sq ft the $60,000 contract is the higher figure.
- Plan review: 65% of the permit fee for residential. The guide also lists $40 for “modifications to existing single-family dwellings.”
- Use tax: 3.46% × 58% of valuation (Arvada use tax reconciliation).
- Worked example (estimate): $654.25 + (10 × $7) = $724.25 permit + $470.76 plan review + $1,204.08 use tax = ~$2,399. If the $40 review applies: ~$1,968.
Westminster
- How fees are calculated: Valuation table, Building Division Fee Schedule effective Jan 1, 2026.
- Plan review: 65% of permit fee.
- Trade fees: An extra 15% of the permit fee and 15% of the plan review fee for each of mechanical, plumbing and electrical.
- Use tax: 4.25% of 50% of total valuation.
- Worked example (estimate): $546.70 + (10 × $5.95) = $606.20 permit. Plan review 65% = $394.03. Trade permit fees 3 × 15% × $606.20 = $272.79. Trade plan review 3 × 15% × $394.03 = $177.31. Use tax 4.25% × $30,000 = $1,275. Total ~$2,725.
Centennial
- How fees are calculated: Valuation table, Building Permit Fee Schedule (no date printed on it). $50,001–$100,000: $643.75 + $7 per $1,000. See the basement finish checklist.
- Plan review: 65% of permit fee.
- Use tax: 2.5% city + 0.25% Arapahoe County, collected at the permit on 50% of valuation as a deposit (Building Materials Use Tax FAQ).
- Trade permits: The schedule includes a residential electrical table ($100 up to 1,000 sq ft of living area).
- Worked example (estimate): $643.75 + $70 = $713.75 permit + $463.94 plan review + $825 use tax = ~$2,003.
Littleton
- How fees are calculated: Valuation table, Permit Fee Schedules (Resolution 2025-105, adopted December 2025). $50,001–$100,000: $708.12 + $7.70 per $1,000.
- Plan review: 65% of permit fee when plans are reviewed.
- Use tax: 0.01969 × total valuation, plus Arapahoe County open space 0.00125 × total valuation.
- Worked example (estimate): $708.12 + $77 = $785.12 permit + $510.33 plan review + $1,181.40 use tax + $75 open space = ~$2,552.
Englewood
- How fees are calculated: Valuation table, 2026 Rate and Fee Schedule (effective Jan 1, 2026; EMC 16-2-3).
- Plan review: 65% of permit fee.
- Use tax: 3.8% of half of valuation, plus Arapahoe County open space 0.25% of half (Sales, Use and Other Taxes).
- Worked example (estimate): $733.62 + (10 × $7.97) = $813.32 permit + $528.66 plan review + $1,140 use tax + $75 county = ~$2,557.
Wheat Ridge
- How fees are calculated: Valuation table “per 2026 adopted budget” (Permit Valuation & Fees). Minimum valuations may be set as a percentage of ICC data for some project types. The page notes the fee doesn’t include use tax.
- Valuation: The higher of your number or a minimum. A basement finish with walls and a bath is 30% of the ICC R-3 value. That works out below $60,000 for 1,000 sq ft, so the contract value controls.
- Plan review: 65% of the permit fee, due at application.
- Use tax: 3.5% of 60% of valuation.
- Worked example (estimate): $729.55 + (10 × $8.05) = $810.05 permit + $526.53 plan review + $1,260 use tax = ~$2,597.
Castle Rock
- How fees are calculated: The town sets the valuation at $20.51 per finished sq ft for basement finishes, then runs it through the table (2026 Fee Schedule, July 1, 2026 update).
- Plan review: 65%.
- Use tax: Half the valuation × 4.2% (town) plus half × 1% (Douglas County), both collected at the permit.
- Worked example (estimate): 1,000 × $20.51 = $20,510 valuation. $69.25 + (19 × $14) = $335.25 permit + $217.91 plan review + $430.71 town use tax + $102.55 county use tax = ~$1,086.
Ken Caryl (unincorporated Jefferson County)
- How fees are calculated: Valuation table (Building Permit Fee Schedule). The new code and fee schedule apply to permits applied for on or after July 1, 2026 (Building Safety). Use the county’s fee estimator, which has a “Finished Basement SF” field. Fractions of a dollar round up.
- Plan review: 65% of the permit fee, but not to exceed $100 for alterations to one- and two-family homes valued under $75,000.
- Other fees: A zoning review fee is due at submittal (2026 Development fees). It’s $100 for a “Residential Alteration, Finish, Conversion.” Starting work before the permit is issued doubles the fee.
- Use tax: None. Unincorporated Jefferson County doesn’t charge use tax (county Fees page).
- Worked example (estimate): $487 + (20 × $9) = $667 permit + $100 plan review (capped) + $100 zoning review = ~$867.
Commerce City
- How fees are calculated: Valuation table, Directory of City Fees and Charges, rev. May 18, 2026. Section 2 building permit fees: $832.94 + $9.06 per $1,000 from $50,001–$100,000.
- Plan review: 65%, due at application.
- Use tax: 4.5% city use tax on 60% of the project value, collected with the permit as a deposit (construction tax brochure; rates eff. 1/1/26).
- Worked example (estimate): $832.94 + (10 × $9.06) = $923.54 permit + $600.30 plan review + $1,620 use tax = ~$3,144.
Erie
- How fees are calculated: Basement finish valued at $38.72 per sq ft (2026 Project Valuations memo, under Resolution 25-189). The Fee Schedules page posts the table: $391.25 + $10.10 per $1,000 from $25,001–$50,000.
- Plan review: None on a basement finish.
- Trade permits: No separate mechanical, electrical or plumbing permit fees on a basement finish.
- Use tax: 50% of valuation × (3.5% town + 1.335% Boulder County).
- Worked example (estimate): Valuation $38,720. Use tax = $19,360 × 4.835% = $936.06. Permit: $391.25 + (14 × $10.10) = $532.65. Total ~$1,469.
Brighton
- How fees are calculated: Valuation table, Resolution 2025-87 (2026 fees).
- Plan review: 65%.
- Use tax: 3.75% of 50% of valuation (Adopted Fee Regulations).
- Worked example (estimate): $643.75 + $70 = $713.75 + $463.94 + $1,125 = ~$2,303.
What’s not in the permit number (but can still show up)
- Egress windows. Some cities permit them separately. Aurora’s is a $99 flat permit. Every basement bedroom needs one. See Step 2 of our 20-step process.
- Re-inspections. Usually $47–$100 an hour if an inspection fails. We plan our work so it doesn’t.
- Retro permits. If a basement was finished without a permit, many cities double the fee or add investigation fees.
- Septic, fire district, and HOA approvals. These are common in Evergreen, Castle Rock and Parker.

FAQ
Do I need a permit to finish my basement in the Denver metro?
Yes. Every city and county on this list requires a building permit for a basement finish that adds walls, electrical, plumbing or mechanical work.
Who pulls the permit, me or the contractor?
When you hire us, we do. Some cities (Lakewood, for one) let homeowners pull their own permit on a single-family home. Then the inspections, corrections and liability are on you.
Why is use tax part of my permit bill?
Most cities collect their sales tax on building materials up front at the permit counter, since the materials will be used inside city limits. It’s usually figured on 50% of the job value and reconciled when the job is done.
Is the permit fee the same as the plan review fee?
No. Plan review is a separate charge, usually 65% of the permit fee, and it’s sometimes due when you submit.
How long does a basement permit take?
It varies by city and season. Douglas County offers same-morning over-the-counter review for basements. Ask us what your city is running right now.
Can I save money by skipping the permit?
Not in the long run. Unpermitted basements cause trouble at resale and with insurance, and getting one permitted after the fact usually costs more.
What if the city values my basement higher than my contract?
Denver and Arvada (among others) can use ICC valuation data instead of your price, whichever is higher. That’s a big reason quotes from online calculators miss.
How we handle permits
We handle permits across the Denver metro. When you hire Gribbons Group, we draw the plans, submit them, pay the fees and track the review. We schedule every inspection and meet the inspector on site. Your permit cost shows up as its own line on our written quote, so you’re not guessing.
Want to see the whole job laid out? Read our Denver basement finishing guide, or check out basement finishing in Denver and our service area. City pages: Lakewood, Arvada, Highlands Ranch, Littleton, Aurora, Centennial, Westminster, Castle Rock, Ken Caryl. Also see basement permits in Denver: who issues them.
Thinking about finishing your basement? Call our 24/7 line at (720) 223-9003 (calls only), or request a quote.
Sources were checked October 22, 2026. Fee schedules change, usually on January 1 or July 1. Every dollar figure here is an estimate for planning, not a quote or a city determination.