Bathroom Remodel in Denver
Full remodels, shower upgrades, tub-to-shower conversions, and vanity refreshes, with waterproofing, plumbing, and tile sequenced by one contractor.
Most bathrooms we remodel start around $10,000 and take about 1 to 6 months depending on scope. Your written estimate spells out exactly where yours lands.



Bathrooms That Work Harder
Primary baths, guest baths, and easier-access updates. We design the remodel in-house around how the room is used every day, then build it from design through install.
Common Project Types
Full gut remodel; shower upgrade, including curbless showers; tub-to-shower conversion; vanity and lighting refresh. Offerings are confirmed per project after we understand your goals and existing conditions.
From our RiNo Denver double duplex, a 4-unit gut remodel by Gribbons Group.




Waterproofing and Trade Coordination
Wet areas fail when waterproofing and trades are disconnected. GC oversight keeps plumbing, tile, and finishes sequenced so the assembly is built correctly.
Timeline Drivers
Most bathroom remodels take about 1 to 6 months. Tile lead times, fixture selections, and plumbing moves commonly decide where yours falls in that range. We flag those early so expectations stay realistic.
Process Snapshot
Consult → scope & estimate → permits & scheduling → build → walkthrough, the same steps as every GGC remodel. See Process.
Related Services
Also considering a kitchen remodel or basement finishing? We can plan and schedule them together.
See our work: a kitchen remodel before and after, and a full 4-unit gut remodel in RiNo with new bathrooms in every unit.
Service Area
Denver metro plus Aurora, Lakewood, Littleton, Highlands Ranch, Arvada, Westminster, and Centennial. See our service area.
Bathroom Remodel FAQs
How much does a bathroom remodel cost?
Most bathrooms we remodel start around $10,000. Gut vs. refresh, tile and fixture selections, and plumbing moves change the number from there. Your written estimate spells out exactly where yours lands.
How long is a typical bathroom remodel?
Most bathroom remodels take about 1 to 6 months depending on scope. Gut vs. refresh, tile complexity, and fixture lead times set where yours lands, and you receive a project-specific schedule with the estimate.
Can you convert a tub to a shower?
Yes, when layout and plumbing support it. We review waterproofing, curb or curbless options, and any code considerations during scoping.
Do bathroom remodels require permits in Denver?
Plumbing and electrical changes often trigger permits. We identify likely needs during the estimate process.
Will you protect the rest of the house during demo?
Yes. Dust control and protection of adjacent spaces are part of how we run bathroom jobs.
How do I start with GGC?
Request a free estimate or email sean@ggcbuilds.com. Share photos if you have them — helpful, not required.
Request a Free Estimate
Get a Free Estimate on our Contact page, or email sean@ggcbuilds.com.
